- Joined
- Feb 13, 2016
- Messages
- 6
- Reaction score
- 0
Greetings
I've been searching and reading all morning, but have not found any directly common situations
I have a stack of three tanks, which I am moving a few feet and plan to frame around with windowed viewing, essentially formalizing the existing effect of using the stack as a divider between rooms
the stack has had individual pumps and filters for the past 4 years, but I wish to setup a drilled overflow to sump, common sump, common return
Using a pump I recently obtained,
4-mdqx-sc
and measuring max flow of 900+ at 10 ft with 3 other outputs at 3, 5,and 7feet,
I figure I can get a balanced flow of 250~300 gph to each tank
drilling 2 holes per tank, one main, one emergency
thinking Durso, open to other quieting ideas mebbe a bean on the end wall.....
all the utilities will be on the end of the stack, and given the tight quarters under the tanks, is there any advantage to driling the ends as opposed to the traditional bottom?
go with 1" bulk heads, or is 3/4" sufficient/better ?
can I " Y" the top tank drain into the middle tankdrain , then to the bottom tank,...? increasing pipe dia of course
otherwise, I'm going to end up with 6 pipes into the sump.....
Sump is restrained by underneath frame constraints
like an L on its side, it will be appx 7" high, foot wide, mebbe 2~3 feet long .
the short leg of L will be drain entry
rough sketch included
just looking for some rough guidance
feel free to redirect me if this has been covered elswhere
Thanks in advance Gents
I've been searching and reading all morning, but have not found any directly common situations
I have a stack of three tanks, which I am moving a few feet and plan to frame around with windowed viewing, essentially formalizing the existing effect of using the stack as a divider between rooms
the stack has had individual pumps and filters for the past 4 years, but I wish to setup a drilled overflow to sump, common sump, common return
Using a pump I recently obtained,
4-mdqx-sc
and measuring max flow of 900+ at 10 ft with 3 other outputs at 3, 5,and 7feet,
I figure I can get a balanced flow of 250~300 gph to each tank
drilling 2 holes per tank, one main, one emergency
thinking Durso, open to other quieting ideas mebbe a bean on the end wall.....
all the utilities will be on the end of the stack, and given the tight quarters under the tanks, is there any advantage to driling the ends as opposed to the traditional bottom?
go with 1" bulk heads, or is 3/4" sufficient/better ?
can I " Y" the top tank drain into the middle tankdrain , then to the bottom tank,...? increasing pipe dia of course
otherwise, I'm going to end up with 6 pipes into the sump.....
Sump is restrained by underneath frame constraints
like an L on its side, it will be appx 7" high, foot wide, mebbe 2~3 feet long .
the short leg of L will be drain entry
rough sketch included
just looking for some rough guidance
feel free to redirect me if this has been covered elswhere
Thanks in advance Gents


I'm not even sure what that means in this context. 

