I thought all of these guys had died off when I added them to my tank to eat all the aiptesias. Guess not, I've been seeing them periodically.
I'm ashamed on the quality of these photos I'm about to show you guys. LOL
I have to give a lot of respect to guys who have large tank set ups. Looked through countless threads before I came up with what I wanted and felt would work.
Final product after spending over $500 in PVC plumbing alone! Over bought a ton of stuff so I wouldn't have to make multiple trips to Home Depot or Lowes... ended up going to between the two like 12 times! Returned about $235 in PVC so it wasn't so bad. Most of the money went into threaded gate valves, threaded unions, and fittings in case I ever need to tear it apart and rebuild a section.
Anyways, I had to switch everything from one side to the other. Wasn't too hard but it worked out.
Just looking at the photos now, I realized I'm missing two ball valves that are needed. One on the exit of the chiller and then another one after the bypass/union leading to the return water into the tanks. Everything is glued into place except for the chiller section so a majority of it will be easy to add in.
A more thorough explanation of everything works:
Return - Jebao DC12000
1.5" Threaded Union
1.5" True Union Check Valve
1.5" Split into reducers 1.25" & 1"
1" goes into a 1" true union ball valve then into manifold system composed of (1) 3/4" gate valve, (2) 1/2" gate valves, (2) ball valves, and (1) 3/8" John Guest valve (air pressure and water relief valve)
1.25" goes into a 1.25" true union ball valve then into the chiller section
1.25" goes into a tee that leads to a 1.25" gate valve for water bypass, the other one is reduced into a 1" that will feed the chiller
*Reason why I did this was because I wanted to make sure the water feeding the chiller had enough contact time to cool down properly and not go in and out thus not cooling correctly. Bypass will be partially open to reduce pressure build up on the pump while still allowing full flow if desired.
1.25" exits the chiller and continues it way to the return manifold
1.25" manifold are then split into two 3/4" returns, reducers were used to step them down
Each 3/4" gate valves on both for flow control followed by unions to ease the removal if needed for cleaning/servicing
One of the 3/4" will feed the frag tank that splits into two 1/2" exits. The exits have loclines with ball valves on them
The other 3/4" will feed my main tank
Pipe step down/reducing was to reduce the head loss considering how much piping it goes through before entering the tanks.
I see a few faults in the plumbing but it will do for now, I can always improvise later on if things come up.
Some other stuff to add, the plumbing is pretty stiff once everything was glued into place. Vibrations come to mind, its a garage set up but its my OCD ways. I ended up using foam tape on certain areas where contact is made with the stand to prevent it from happening or even pipe rubbing over time can develop holes leaking to leaks (unlikely, LOL)
Next project, lighting the frag tank and the sump area. I'll have more pictures of the frags and stuff up soon.