- Joined
- Jun 12, 2015
- Messages
- 641
- Reaction score
- 103
This weekend I hope to set up my APC and DCI to control by Jebao pumps. I currently run them with a Jebao dual controller with only 1 power supply tied to the controller that powers both pumps. I see that the DCI has two (2) 24v power connections. The separate power supplies that I have for the Jebao's are 5v I think. Can I use the 5v power supplies? Do I need both or can I just use the larger one tied to one of power jacks on the DCI to power both pumps?

