I have two returns, one on each side of the tank, that I am going to plumb with using a T to split them from the pump.
Several questions
Should I put check valve on each return line or just one right before the T?
If I need a check valve on each return where to I put it, close to the T or closer to the bulkhead?
I also plan to put a 2" Neptune flow sensor on each return, should I put those right before the
bulkhead?
Finally I plan to put a shutoff on each return line again where should those go right after the flow sensor?
I don't really have any room under the stand for these items. The plumbing size is 1 1/4
Thanks
Several questions
Should I put check valve on each return line or just one right before the T?
If I need a check valve on each return where to I put it, close to the T or closer to the bulkhead?
I also plan to put a 2" Neptune flow sensor on each return, should I put those right before the
bulkhead?
Finally I plan to put a shutoff on each return line again where should those go right after the flow sensor?
I don't really have any room under the stand for these items. The plumbing size is 1 1/4
Thanks