Rev's 400+ Gallon Basement Inwall

When you do your plumbing put in a couple of extra outlets from the return side with a shut-off valve on them for now. Every time I have done a build I seem to need just one more hook-up for a reactor , seperate fuge or something. Easier now than later.
 
When you do your plumbing put in a couple of extra outlets from the return side with a shut-off valve on them for now. Every time I have done a build I seem to need just one more hook-up for a reactor , seperate fuge or something. Easier now than later.

Good thinking!
 
I thought your bulkheads were out for delivery?? You are slacking on the build, I had to click page 2!?!?
 
I promise to have some new photos this weekend! I got the sump stand built and I will try to paint it tonight. Then I can plumb at least the tank to the sump to get it wet! :)
 
Take your time, you only get one chance to do it right while it's dry, after that somethings gonna wanna leak while your working on it. :)
 
Building and painting a cat walk, sump stand, work bench, and water storage stand. These aren't perfect but they'll do the job!

image.jpeg


image.jpeg


image.jpeg


image.jpeg


image.jpeg
 
Woo you have been busy since I last checked on here! It's finally coming together! Great job so far, I can't wait to see some shots of this baby fully up and running:)
 
Building and painting a cat walk, sump stand, work bench, and water storage stand. These aren't perfect but they'll do the job!

image.jpeg


image.jpeg


image.jpeg


image.jpeg


image.jpeg

Nice update broski! I'm jealous I don't get to plumb it... you are going to have a lot of fun doing it.
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%
Back
Top