so just replaced the membrane, (99.8%) sediment, filter, carbon block, chlorimine block, HC DI resin and the Uktra DI (final polish) all of which came from Specrapure. Final TDS is 0. But the problem is I have very low production rate compared to replacing everything. Everything replaced is identical to what was in there to begin with. I use a booster pump and run at about 75 psi my temp in WA state is in the 90's.
What could cause my very slow production rate (less than 30 gallons per day) the membrane is rated at 90 GPD. Production was on par before filter swap just high TDS.
What could cause my very slow production rate (less than 30 gallons per day) the membrane is rated at 90 GPD. Production was on par before filter swap just high TDS.




