After watching Dr. Tim's presentation on the advantages of a deep sand bed, I've decided to go that way. But having to bury 6 inches of expensive rock in order to maintain structure stability seems wasteful. My proposed solution is to drill my foundation rock and insert fiberglass rods as supports, so that the rods will be hidden by the sand, with only a fraction of an inch of rock actually embedded. Thoughts on why this would be impracticable?

