Running RO tubing through floors, walls

Zissou Intern

Community Member
View Badges
Joined
Nov 15, 2023
Messages
45
Reaction score
35
Location
Northeastern PA
What state or country do you live in
Pennsylvania
Rating - 100%
1   0   0
Hi, reefers. I’m setting up a mixing station in my basement, and I think I have most of the plumbing worked out.

But I’m not sure how to neatly run three 1/4 inch water lines between my tank and the basement. I recall once seeing what looked like a John Guest connector affixed to a wall plate, but now I can’t find it. For my needs, something that comes up from the floor would be even better.

How are other reefers doing this? The tank is in my living room, so I’m looking for a solution that will look neat, clean, and professional. Nearly invisible would be even better.

If there are no good options I’ll probably just drill 1/4 inch holes through the hardwood, but I’d rather avoid drafts in the winter, bugs in the summer, etc.

Thanks for any suggestions. I’m eager to see what others are doing.
 
Is there a reason you need three lines to run between the two floors? Can you run fewer?

Before you drill into hardwoods, which sometimes is unavoidable, I would consider cutting a small outlet plate-sized hole in the wall behind the tank, and then drill down in between the studs (or up from the basement).

Cover said drywall hole with an outlet plate once complete. You can drill a hole in the plate just big enough to fit the RODI tubing and even spray some spray insulation on the backside if worried about drafts/bugs.
 
Cut a hole in the drywall, drill through the sill plate, run your lines and then figure how you want them to come out of the wall. Could add an access panel and drill through the access panel face. They make spring loaded access panels which can be installed in seconds.

I would highly advise against drilling your hardwood. If you drill a 3/8 for the tubing in the sill plate you won't have a bug or draft issue. Your electrical line holes are already 1/2 or 5/8 atleast and aren't sealed.
 
Thanks everyone. I had been thinking that it would be a pain to drill through the sill plate. But I agree that would help avoid drafts, etc. I’ll go that direction. Thanks again.
 
Old work two gang junction box (back cut off) and a ‘custom’ 2 gang blank.
 

Attachments

  • IMG_7404.jpeg
    IMG_7404.jpeg
    106.8 KB · Views: 45
  • IMG_7406.jpeg
    IMG_7406.jpeg
    155.6 KB · Views: 44
Old work two gang junction box (back cut off) and a ‘custom’ 2 gang blank.
That looks neat. Just make sure they are good quality ones. I ordered some from Amazon and after about 2 weeks I chucked them in the bin. I noticed that the tighter threading ones appear to be better that the course threaded ones. But that is just my observation.
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%
Back
Top