Hey folks,
Day 2 of the build consisted of finishing up my dry plumbing. I'm pretty pleased with the way I did it. I was short a 45degree elbow for my emergency drain so I can finish running it down to the the main overflow chamber, easy fix. I was going to run a 2 ball valve manifold, but I will only be running a reactor in the near future. I'll see what I come up with if I decide to go with an algae scrubber. For now I am satisfied, hence the fact I am limited on space under there.. lol.