So, would using schedule 80 elbows considerably lower the return water flow? I am going to be using Vectra M1 DC as my return pump and have 2 reactors on manifold for my reefer 350. All the gate valves are schedule 80 but I don't see the need for high flow for them anyways.
My concern is water returning to my DT, would using 3/4" schedule 40 pipes along with schedule 80 elbows be a bad idea.
Please let me know what you guys think
My concern is water returning to my DT, would using 3/4" schedule 40 pipes along with schedule 80 elbows be a bad idea.
Please let me know what you guys think

