Long time no see! I just got back from a work trip to Orlando this morning, and spent this evening mocking up the sump plumbing and putting together the in-tank plumbing...
Here’s the new overflow (left) next to the old design (right)...
The new design reduces the length of 3” pipe, hopefully reducing overflow noise.
And it’s the perfect spot for an easily accessible filter pad!
Drain grate keeps the critters out...
Just has to be levered open, as it sits flush with the top lip.
Here’s the new return line (left) next to the old design (right).
Installed and looking dope!
I also got the rest of the down pipes finished , with the exception of the ATS box.
I still haven’t decided if I wanna build that ATS return concept or not... it just didn’t work out to have two like I had originally planned (maybe when I buy my first custom tank haha), so I’m contemplating just doing one and letting the other down pipe run straight to the refugium... here’s the ATS prototyped out of foamcore.
Basically turned into a vertical ATS, and I used a universal S-bend to allow the ATS to be removed for cleaning/repairs...
what do you guys think?