- Joined
- Apr 28, 2019
- Messages
- 433
- Reaction score
- 753
Like the title states I'm preparing to setup Trident controlled dosing. Space is limited so I'm trying to to determine where to mount the Dos units and containers of liquid to be dosed. One option is on a shelf in my utility room the Dos pump could basically draw directly from the containers in this location but would then have to push the solution through 14-15' of tubing before they reached the return chamber of my sump, are there issues with accuracy pushing liquid to dose over this distance? Will the dosing lines clog up with solution sitting in this 14' run? I'm new to using the Dos to move anything but water so want to double check.
Thanks
Thanks


