Having a sump made for my next tank. Im interested to hear other thoughts on the plumbing. I was going to keep it simple, drains, returns x2 and 8 dosing lines. Question is if the manifolds are something worthwhile or if anything fancy is really necessary or nice to have? This should be here in about 1 month, then I could start plumbing it outside the tank to get at least the sump section completed, and connect the tank to it later since I dont have it yet.
Can't imagine using reactors if I have a fuge and considering an ATS in the fuge section.
Sump is 40x24x18.