I have done 1 other plumbing project before this that was much smaller. This build has a manifold for a UV sterilizer and it has complicated things.. lol
The union on the left is off about 2/16" so I need to fix it but I messed up once and I am afraid to mess it up again.. x(
I plan to cut the return line at the top before the 90° to the bulkhead. Insert a coupling and remove the N(3/32") + 2/16". This is a 3/4" coupling.
I think it should line up perfectly after that. Any advice is greatly appreciated though!
The union on the left is off about 2/16" so I need to fix it but I messed up once and I am afraid to mess it up again.. x(
I plan to cut the return line at the top before the 90° to the bulkhead. Insert a coupling and remove the N(3/32") + 2/16". This is a 3/4" coupling.
I think it should line up perfectly after that. Any advice is greatly appreciated though!
Last edited:

![20240420_115202[1].jpg 20240420_115202[1].jpg](https://test9.reef2reef.com/data/attachments/3548/3548674-c51bc4a0ebc6f4211d1ae4a73b72eb58.jpg?hash=xRvEoOvG9C)
![20240420_115459[1].jpg 20240420_115459[1].jpg](https://test9.reef2reef.com/data/attachments/3548/3548681-b8dc4fd1e29e068c85931516a37f1492.jpg?hash=uNxP0eKeBo)
![20240420_115448[1].jpg 20240420_115448[1].jpg](https://test9.reef2reef.com/data/attachments/3548/3548682-299b2dcc0926b9380146cafcab1d3d95.jpg?hash=KZstzAkmuT)

