Not picky on battery choices, but keep to same type(AGM, SLA). AGM is preferred, but it works fine on regular SLA batteries, bigger is better. If given free choice, I'd seek 49 or 94 series AGM ( 92/105Ah @ 20 hr rated). The APC smart ups 1500(va) runs on 24v so 2 batteries(wired in series) minimum, I run 4(2 batteries ran parallel, then both banks of 2 wired in series). I have 4 more batteries to add, for total of 8, once I clear a spot in cabinet in garage. I started this setup(and bought a generator) in the end of 2017, after hurricane IRMA caught me with my pants down (I wasn't ready). I test it regularly, every few months, for about 8-10 hours; until I get tired hearing it beeping. When showing my tank, I typically pull the plug to show it switch without a flicker from the lights. About 18 hours is the longest I've ran it(last year, hurricane Ian), that's the full tank with 3 hydra64, no halides during power failure mode. Even then batteries were still @ 12.1v, I believe it still had 5-6+ hours available. A couple times a strong thunderstorm has caused power failure of a couple hours, I don't hesitate to plug some lights and 70" tv in with the tank. This apc can connect to network issuing shut down commands and allows programming of outlet groups(can shut 1 outlet group down after say 2 hours(however long hou want) and only keep other outlet group on after that. I never got into all that but now that I'm typing it, sounds like a good idea to plug lights into one group and shut it down after 2/3 hours to extend critical equipment run time(plugged into outlet group 2). I never messed with the programming, just figured I'll add more batteries. As is, I have almost a day to drag the generator out. I don't worry about overworking the unit, load is normally within 70% of rated capacity. It weighs like 20-30 lbs, metal housing, transformer is the size of a square cantaloupe, has 4" PC fans keeping it cool. It just doesn't seem like I'm overworking it, not even close.