- Joined
- Dec 9, 2016
- Messages
- 145
- Reaction score
- 115
- Location
- Alexandria VA
- What state or country do you live in
- Virginia
I used the white EcoTech schedule 40 adapters to connect my Vectra L1 directly to my plumbing, without the blue quick disconnect thingy.
Now I want to upgrade to a Vectra L2. Will the pump volute still thread properly into the white adapters? Or is the L2 volute threaded with standard schedule 40 male threads?
Now I want to upgrade to a Vectra L2. Will the pump volute still thread properly into the white adapters? Or is the L2 volute threaded with standard schedule 40 male threads?



