The first time I did a wc from the sump I made sure I put marks to know where the levels were after turning off the pumps. I shut off all the pumps and let the DT drain into the sump, once that's done I marked on the sump where the water level stopped at. I also made a mark on the DT of the level after it drained into the sump. Once I had the marks I siphoned all the water out of the sump (15g) and some from the DT (5g), for a total of 20g. I filled the sump to the mark with freshly mixed water and added some to the DT to bring the water level up to the mark I made when it drained into the sump, I then just turn on the pumps and everything levels out to were it should be. From start to finish it takes me about 30 mins just for the wc, if you add cleaning and changing media, about an hour.