I currently run a CyberPower 1500 with Apex power monitoring and a keep-alive program that just runs the return, wavemaker and skimmer periodically during an outage. That is my current solution for my 65g tank. I will be adding a 2nd 120g tank however so are planning to improve this.
We have a rooftop solar PV system and the inverter has an outage protected circuit. I plan to add a battery in about 6-12 months and will then run the tanks and fridge on that circuit with a VSR (normally on PV/grid, failover to outage protected circuit in an outage).
We have a rooftop solar PV system and the inverter has an outage protected circuit. I plan to add a battery in about 6-12 months and will then run the tanks and fridge on that circuit with a VSR (normally on PV/grid, failover to outage protected circuit in an outage).