120 Project

With drilling done, i got the edges of the holes sanded down with the dremel and a good portion of assembly done on the external box. should be able to finish all silicone and have all pieces on the tank to cure all next week while i am on a work trip in glendale AZ, bye bye frigid winter for a week lol.

20170106_233001_zps40koskrv.jpg

20170106_233013_zpskzrzqpfv.jpg

20170106_233041_zpsmvngtexk.jpg
 

IF YOU HAD TO TAKE A REEFING EXAM, WOULD YOU PASS?

  • Yes!

    Votes: 32 45.7%
  • Not yet, but I have one that I want to buy in mind!

    Votes: 9 12.9%
  • No.

    Votes: 26 37.1%
  • Other (please explain).

    Votes: 3 4.3%

New Posts

Back
Top