- Joined
- Mar 7, 2016
- Messages
- 243
- Reaction score
- 122
With drilling done, i got the edges of the holes sanded down with the dremel and a good portion of assembly done on the external box. should be able to finish all silicone and have all pieces on the tank to cure all next week while i am on a work trip in glendale AZ, bye bye frigid winter for a week lol.

