One thing I really like about the way I placed the plywood on the very bottom then the 2x4s on top of it then sealed and caulked the cracks and joints is it holds water. I had a dripping/leaking reactor and it held over an inch of water before I discovered it.
Good to know ill buy some caulking when I go to pick up wood for the top and bottom. Thanks for all the input and ideas!!
Sent from my iPhone using Tapatalk


