- Joined
- Aug 21, 2019
- Messages
- 743
- Reaction score
- 348
I watched melevs "about water mixing station" from today, he said you want large pipes after hose barbs on pumps or at least on hi vectra, because the water is being squezed through the thin portion.
Why is this and do you always want larger pipe after hose barb fitting on pumps?
Why is this and do you always want larger pipe after hose barb fitting on pumps?


