- Joined
- Jul 18, 2018
- Messages
- 1,903
- Reaction score
- 5,121
- Location
- Lima, OH
- What state or country do you live in
- Ohio
I’m working on plumbing my first custom build, and I’m dry-fitting plumbing for the overflow box. I want your thoughts and suggestions so that I can change what may need changed before I get too far into the project.
The overflow box is configured for a Bean Animal configuration. It can handle 1,600 GPH, which I will not come close to. I have a 1” gate valve on the primary drain, sandwiched between two union. There are also unions on the secondary drain and on the emergency drain.
Do you see anything that I should change?
The overflow box is configured for a Bean Animal configuration. It can handle 1,600 GPH, which I will not come close to. I have a 1” gate valve on the primary drain, sandwiched between two union. There are also unions on the secondary drain and on the emergency drain.
Do you see anything that I should change?

