Eh... it's not a lot of safety factor.
Quick calculation is 260*8.3 = 2158lbs, rounded up to 2400 for ease, then let's say 1/2 is on this 2x8, that's 1200 over a 6' span gives 200plf (pounds per lineal foot). That's the upper limit for spruce/fir/hem #1. You would be better with doubled 2x6 actually... definitely doubled 2x8.
I'm fudging some of this, as I'm not an engineer and I don't have all the info for your situation, but I'm calculating this as though it were a header in residential construction.
It is probably ok, but if you have the option, I would do it a little differently.
If you already built it (is that it painted white in the photo?) then you could reinforce it a couple different ways... adding another 2x8, adding plywood, create an i-joist by adding a bottom cord... or everyone's favorite... steel!