I would cut it down and move the sump directly under the overflow to eliminate as much flex hose as possible to reduce headloss or back pressure which slows the overflow rate.
I will cut it down so it will fall right straight into my sump. Will I need a barb fitting or can I just Clampett to the pvc coming out of the bulkhead?