Dry fitting the plumbing. I decided to use the 3/4 inch pipe and reduce to 1/2 right under the tank just before the bulk head.
I was trying to fit a check valve in. I am running out of vertical space though. I was contemplating branching from the vertical bar to a horizontal manifold (last picture), but I think it might defeat the purpose of trying to use the check valve in the first place (if I have a branch before the check valve, I am thinking that it will just siphon out through the manifold.).
Please let me know if the current setup looks good or if there are any foreseeable problems with this plumbing.
Thanks!!