I am learning / researching to consider DIY vs PNP on my next big build.
Do the standpipes connecting to the bulkheads inside a internal overflow box need to be glued down in place?
I know you glue a pvc pipe connection to the bulkhead on the sump side (to a union as well). But what about inside the overflow box?
Do the standpipes connecting to the bulkheads inside a internal overflow box need to be glued down in place?
I know you glue a pvc pipe connection to the bulkhead on the sump side (to a union as well). But what about inside the overflow box?


