- Joined
- Nov 24, 2014
- Messages
- 1,301
- Reaction score
- 1,099
- Location
- The People's Republic of California
I plan on running 2 separate independent return pumps/lines.
I’m about to place my order for a new sump and have the option of drilling the sump for 2 - 1.25” bulkheads or 2 - 1” bulkheads.
The issue is, I cannot find 1.25” bulkheads or silicone tubing ANYWHERE.
I plan on running 5-8 x turnover rate on my 262 display.
Should I go with 1” or 1.25”?
I’m about to place my order for a new sump and have the option of drilling the sump for 2 - 1.25” bulkheads or 2 - 1” bulkheads.
The issue is, I cannot find 1.25” bulkheads or silicone tubing ANYWHERE.
I plan on running 5-8 x turnover rate on my 262 display.
Should I go with 1” or 1.25”?

