It’s a bean animal style. The top half of the plumbing is included. Below the bulkheads will need plumbing. Here is the link to the INT-75 gal plumbing which is identical.So the tank, stand, screen and ato for that. How's it drilled? Herbie style? 1 inch and 3/4 internal or external overflow. Also what sump are you going to run?
https://www.f3images.com/IMD/UserManuals/0I6700.pdf
I’m going with a custom sump 30 x 18 x 15 similar to the one below. Manny at Reef Gardens is building the sump.


